// ../../../../../../highslide/highslide.js = highslide.js, ../../../../../../highslide/highslide.css = highslide.css, ../../../../../../highslide/highslide-with-html.js = highslide-with-html.js ?> ?>

HPC-09 v6 Example: Scheduler

Below a part of the HPC-09 v6 Scheduler shows the data entered for Bed 1, and the Status "Waiting". This Status indicates to both the Program Operator and the Personnel at the Casting Beds that Data has been Entered and Temperature, Strength and Curing Time Predictions has been Calculated: The "Waiting" Status also indicates that Casting may begin.

There is a lot more data presented by HPC in other Tabs of the Scheduler, and 2D and 3D Temperature and Strength data is also available.

Part of the HPC-09 v6 Scheduler displaying Status "Waiting" for Bed 1.