HPC-09 v6 - Lean Quality Factors

Also see: Lean Save - Reduce, Lean Economy Factors

As we saw earlier,  Lean Production, or simply "Lean" defines the Seven Wastes denoted by the Japanese term "Muda".

"Lean" is the set of "tools" that assist in the identification and steady elimination of waste. As waste is eliminated quality improves while production time and cost are reduced.

Here we will focus on how HPC-09 v6 improves Quality by reducing 3 of the 7 wastes memorized by the TIMWOOD abbreviation, namely the DOW wastes. As you may remember, the 7 wastes are: Transportation,   Inventory, Motion, Waiting , Over-processing, Over-production and Defects.

Lean Manufacturing Support is made possible through HPC-09 v6's Accurate Predictions.

How HPC-09 v6  improves Quality

By providing accurate and Trustworthy Temperature and Strength Predictions and Real-Time calculations, HPC-09 v6 reduces the occurrence of Quality Problems caused by the Wastes identified earlier:

  • Strands (tendons, wire) being cut too early and thereby wasting the production of an entire bed!
  • Cracks in the concrete due to too high temperature gradients across the Slab (element).
  • Loss of humidity causing parts of the slab to be only partially cured.
  • Discrepancies in the Concrete Mix which degrades the quality of the finished product. 

HPC-09 v6 Discrepancy Detection, Predictability Technology and Safe Maturity Calculations are all important technologies to reduce Waste and secure Quality.

You can read more about how HPC-09 helps improving Production Economy at this link.